Product Description
Pear Pipe Galvanized Adjustable Swivel Loop Hanger for Ventilation Ducts
Finish:Zinc plated, other finish available upon request Service:
Recommend for suspension of non-insulated stationary pipe line Manufactured to use the min. rod size permitted by NFPA for fire sprinkler pipe line Approvals Complies with Federal Specification A-A-1192A (Type 10) WW-H-171-E (Type 10) and MSS-SP-69 (Type 10). FM approved & UL/ULC Listed Ordering:Specify Part Number
Loop Hanger |
1 |
1/2" |
DN15 |
2 |
3/4" |
DN20 |
3 |
1" |
DN25 |
4 |
1-1/4" |
DN32 |
5 |
1-1/2" |
DN40 |
6 |
2" |
DN50 |
7 |
2-1/2" |
DN65 |
8 |
3" |
DN80 |
9 |
4" |
DN100 |
10 |
5" |
DN125 |
11 |
6" |
DN150 |
12 |
8" |
DN200 |
13 |
10" |
DN250 |
Packaging & Shipping
Company Profile
This is general company info. For the latest and most complete products, news, updates and additional information, please contact us. We invite you to work and grow together.
FAQ
The following FAQ is for your reference. If you have any questions, please send us an email. Tianying has been the competitive outside plant hardware manufacturer and supplier.
Attention Service & Ordering:
Are you manufacture?
Yes, we have factory and warehouse in Weifang city,Shandong province.
Free sample:
We offer free samples to customers, except for the model costs.
you just bear the freight. Express delivery charge depends on the quantity of the samples.
The size and weight of package:
The product will be packed bags, then inner carton boxes, and put into wood pallet at last.
Packaging::
Usually, cartons are packed on pallets and fixed, then put into containers. The departure ports for sea shipping are Qingdao ports. Airports are in Beijing, Shanghai etc. Optional courier includes UPS/FEDEX/DHL/TNT, etc.
Lead time:
The lead time for orders is about 20-30 days, and will vary with the quantity of the order. Samples are usually delivered in about 7 days, and custom samples are available on a case by case basis.